Isle of Capri Bridge Works

Status: Completed May 2015

Location: Surfers Paradise

Construct

Value: $430,000 + GST

Category: Civil & Infrastructure/Bridges

Project Details

The Project involved concrete repairs and strengthening of the existing concrete bridge headstocks and substructure to the Isle of Capri Bridge in Surfers Paradise.

Work Undertaken

Some of the key components of this Project were:
  • Temporary traffic control and pedestrian diversions
  • Development and implementation of Environmental Management Plans
  • Defect survey to existing bridge structure
  • Application of Anti-Graffiti Protective Coatings
  • Implementation of temporary works for structural concrete repairs
  • Strengthening to existing concrete headstocks
  • Crack repairs to headstocks
  • Concrete repairs to diaphragm walls
  • Application of Chloride Ion Protective Coatings
  • Application of Concrete Fairing Coat
  • Underwater crack repairs to bridge piles

Print Project