Livingstone Christian College Extensions – Stage 2

Status: Completed December 2006

Location: Ormeau, Gold Coast

Lump Sum (Construct Only)

Value: $2.5M + GST

Category: Building / Education

Project Details

This project involved the construction of Classrooms, a Multi-purpose Centre (MPC), a large Shade Structure and Prep School. The total gross floor area of all buildings was approximately 1,460m2.

Despite considerable wet weather being experienced during the construction of this project, it was completed well ahead of schedule.

Work Undertaken

  • Constructing the project within an operational school, which also included tying into and extending various existing buildings that continued to be operational during construction
  • Design and construction of an all weather access road through the flood plain to enable works to continue despite severe weather being experienced
  • Construction of covered walkways and verandahs with suspended concrete decks located over a flood plane
  • Timber wall frames and trussed roofs to Classrooms and Prep School
  • Combinations of coloured blockwork and exotec (fibre-cement sheeting) external walls
  • Structural steel superstructure to MPC and Shade Structure
  • High impact resistant internal plasterboard walls
  • Compete fit-out of all buildings