This project involved the construction of an SBR Waste Water Treatment Plant as part of the Mt Alford Chicken Hatchery for Inghams.

This Waste Water Treatment Plant was required to be constructed in a very short time frame to enable the Hatchery to be commissioned by a designated date. Alder completed the works within the required time frame and then went on to assist the Client in completing other construction works around the Hatchery that were also required to complete prior to commissioning.

Work Undertaken

  • 1 SBR pond with a capacity of 0.6ML
  • 1 storage pond with a capicty of 0.6ML
  • All associated pipework and valves including influent, effluent, interconnecting between tanks etc
  • All electrical wiring, switchboards and motor control (MCC) centre works
  • Sensors and instruments to enable automatic control of the Plant
  • Access roads
  • Fencing
  • Protective awning to pump and switchboard / MCC area