Search
Alder Constructions
  • Who We Are
  • Our People
  • Our Projects
  • Expertise
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

PROJECTS

Arcadia College

Previous Previous Previous Next Next Next
12345
Open image in lightbox: AlderArcadiaCollege039 Open image in lightbox: AlderArcadiaCollege039
Open image in lightbox: AlderArcadiaCollege021 Open image in lightbox: AlderArcadiaCollege021
Open image in lightbox: AlderArcadiaCollege069 Open image in lightbox: AlderArcadiaCollege069
Open image in lightbox: AlderArcadiaCollege064 Open image in lightbox: AlderArcadiaCollege064
Open image in lightbox: AlderArcadiaCollege048 Open image in lightbox: AlderArcadiaCollege048
  • Ohana Education Ltd

  • Completed September 2020

  • Robina QLD

  • Construct Only

  • $11.5m

Project Details

Arcadia College is a progressive and future focused special assistance education facility. This new co-education secondary school focuses on a safe and inclusive environment encouraging student creativity, collaboration, nutrition and overall wellbeing. The new 3,000sqm building, located in the heart of Robina, increases the school’s capacity to 300 students across its new campus.

The facility houses the grade 7 to 12 classrooms, along with a student wellbeing centre which includes a nurse, psychologist and career counsellor. The new consolidated facility also includes a number of specialty rooms including hospitality, an IT hub, an HPE rock climbing wall, multipurpose basketball court and exterior playground equipment.

Scope of Works

  • Clearing and demolition of existing site including removal of acid sulphate soils.
  • Civil works including the Installation of 7 x 7KL OSD tanks and stormwater filtration system.
  • Installation screw pile foundations and sheet piling for shoring of basement.
  • Construction of a 20-space basement carpark incorporating a dual component HDPE bentonite waterproofing system to all wall and floor surfaces.
  • Dewatering of perched water to basement including regular environmental testing and sampling.
  • Construction of a four storey structure incorporating conventional, post tension and acoustic suspended slab systems.
  • Internal fit out including the use of unique materials such as plywood lining, internal face blockwork and a superb perforated ceiling design.
  • External landscaping including artificial turfing and concrete hardscaping.
  • Successful delivery of a challenging site with tight constraints and proximity to operational facilities.

Print Project

Download PDF
VIEW ALL PROJECTS

Previous Project

Beaudesert Water Treatment Plant

Next Project

Colas Asphalt Plant

Who We Are

Our People

News

Careers

Expertise

Projects

Alder Developments

Current Tenders

Accreditations

Policies

Who We Are

Our People

News

Careers

Current Tenders

Accreditations

Policies

Alder Developments

Website by Ola Digital | Copyright Alder Constructions | Privacy
  • Link to LinkedIn
  • Link to Instagram
  • Link to Facebook
  • Link to Youtube
Link to: Beaudesert Water Treatment Plant Link to: Beaudesert Water Treatment Plant Beaudesert Water Treatment Plant Link to: Colas Asphalt Plant Link to: Colas Asphalt Plant Colas Asphalt Plant
Scroll to top Scroll to top Scroll to top