Client
Boral Asphalt
Boral Asphalt
June 2007
West Burleigh QLD
Design & Construct
$4.7m
The project involved the complete design and construction of a customised asphalt batching plant to replace the existing plant and infrastructure that had been operational on the site for many years. Alder Constructions were involved in the master planning of the overall site, with particular attention to improving the logistics on the site.
Co-ordination with the Chinese based asphalt plant supplier was imperative during both pre-construction and installation to ensure that all elements complied with the relevant Australian Standards and the overall plant design.