Search
Alder Constructions
  • Who We Are
  • Our People
  • Our Projects
  • Expertise
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Previous Previous Previous Next Next Next
1234
Open image in lightbox: Chevron Island Eastern Bridge Renewal 3 Open image in lightbox: Chevron Island Eastern Bridge Renewal 3
Open image in lightbox: Chevron Island Eastern Bridge Renewal 4 Open image in lightbox: Chevron Island Eastern Bridge Renewal 4
Open image in lightbox: Chevron Island Eastern Bridge Renewal 1 Open image in lightbox: Chevron Island Eastern Bridge Renewal 1
Open image in lightbox: Chevron Island Eastern Bridge Renewal 2 Open image in lightbox: Chevron Island Eastern Bridge Renewal 2

Chevron Island Bridge Remediation

At a Glance

Client

City of Gold Coast

Completed

August 2017

Location

Chevron Island QLD

Type of Service

Construct Only

Project Value

$3.7m

Project Details

The remediation and renewal works on the 60 year old Chevron Island Bridge involved concrete repairs to all existing abutments, headstocks and piers as well as replacement of the existing expansion joints, vehicle barriers and extending the width of the northern pedestrian footpath. Due to the age of the bridge, retro-fitting the new structures was a challenging process requiring close collaboration with the client and lead designers.

Known of our innovative constructions methods, the project team designed and installed a bespoke cantilever scaffold system to enable safe access under the bridge.

Scope of Works

  • Temporary traffic control and pedestrian diversions
  • Design and install cantilever scaffold system to allow access under the bridge
  • Demolition of existing concrete footpath and vehicle barrier
  • Fabricate new substructure elements for the extension of northern footpath
  • Retro-fit new substructure to existing bridge
  • Construct new pedestrian footpath
  • Install new VGAN vehicle barrier
  • Fabricate and install new stainless steel handrail
  • Design and install new programmable LED lighting system
  • Sandblast existing structural elements
  • Application of protective coatings to existing structural steel elements
  • Crack repairs to headstock and piers
  • Concrete patch repairs to headstock and piers
  • Application of concrete fairing coat
  • Replace existing expansion joints

Print Project

Download PDF

Previous Project

Silkwood Steiner School Civil Works

Next Project

Oceanview Track Reconstruction

Who We Are

Our People

News

Careers

Expertise

Projects

Alder Developments

Current Tenders

Accreditations

Policies

Who We Are

Our People

News

Careers

Current Tenders

Accreditations

Policies

Alder Developments

Website by Ola Digital | Copyright Alder Constructions | Privacy
  • Link to LinkedIn
  • Link to Instagram
  • Link to Facebook
  • Link to Youtube
Link to: Silkwood Steiner School Civil Works Link to: Silkwood Steiner School Civil Works Silkwood Steiner School Civil Works Link to: Oceanview Track Reconstruction Link to: Oceanview Track Reconstruction Oceanview Track Reconstruction
Scroll to top Scroll to top Scroll to top