Search
Alder Constructions
  • Who We Are
  • Our People
  • Our Projects
  • Expertise
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Previous Previous Previous Next Next Next
1234
Open image in lightbox: Robina Reservoir 1 Open image in lightbox: Robina Reservoir 1
Open image in lightbox: Robina Reservoir 2 Open image in lightbox: Robina Reservoir 2
Open image in lightbox: Robina Reservoir 3 Open image in lightbox: Robina Reservoir 3
Open image in lightbox: Robina Reservoir Open image in lightbox: Robina Reservoir

Robina Reservoir

At a Glance

Client

Gold Coast Desalination Alliance

Completed

October 2008

Location

Robina QLD

Type of Service

Construct Only

Project Value

$3.3m

Project Details

This project featured the construction of a 30 megalitre post-tensioned concrete reservoir to service the Gold Coast Desalination Plant mixing and storage requirements as an essential part of the South-East Queensland (SEQ) water grid.

This reservoir was a critical component of the SEQ water grid roll out, requiring tight management of the construction program to ensure delivery on time. Thorough planning and strict control of all activities on site, resulted in Alder Constructions completing the project ahead of schedule, despite delays due to inclement weather.

Scope of Works

  • 62m diameter and 11m tall concrete structure with 36 internal columns totalling 1300m³ of concrete.
  • The 3000 m² post tensioned concrete slab was constructed in a single pour requiring 30 concreters to complete
  • The concrete walls were constructed in 3 lifts for the full perimeter.
  • 350 tonnes of reinforcement and 100 kilometres of steel tendons.
  • 90 tonnes of structural steel and metal sheet roofing that completely enclosed the tank.
  • Ancillary metal works, including davit arm, ladders, platforms and handrails.
  • Electrical and telemetry works.
  • External works including access road, fencing and drainage works.

Print Project

Download PDF

Previous Project

Hope Island Central – Stage 2

Next Project

Discovery Park Urban Water Design

Who We Are

Our People

News

Careers

Expertise

Projects

Alder Developments

Current Tenders

Accreditations

Policies

Who We Are

Our People

News

Careers

Current Tenders

Accreditations

Policies

Alder Developments

Website by Ola Digital | Copyright Alder Constructions | Privacy
  • Link to LinkedIn
  • Link to Instagram
  • Link to Facebook
  • Link to Youtube
Link to: Hope Island Central – Stage 2 Link to: Hope Island Central – Stage 2 Hope Island Central – Stage 2 Link to: Discovery Park Urban Water Design Link to: Discovery Park Urban Water Design Discovery Park Urban Water Design
Scroll to top Scroll to top Scroll to top