Work Undertaken

  • Installation of 600mm piles at a depth of 14m.
  • Internal demolition of tiered seating, block work walls and concrete mezzanine levels.
  • Design and installation of temporary supports due to fatigue in existing structure.
  • Ceiling demolition completed from a 135ft boom lift in a very confined space.
  • Minor earthworks excavation to lower section of existing building with challenge of restricted access.
  • Subsoil drainage.
  • Shotcrete wall placement to a total height of 3.6m.
  • 2 no. reinforced slabs on ground, tied into each other and the shotcrete wall.
  • Installation of iRide structural steel.