Work Undertaken

  • External demolition of the existing facade and building including a small bridge while incorporating temporary works to provide structural support to the building during construction.
  • Asbestos removal and monitoring including all certification as per regulatory requirements.
  • Installation of 600mm bored piers to a depth of 14m and pile caps for ride amalgamation.
  • Ceiling demolition was completed with the use of 135ft boom strategically shoe horned into position allowing access to the entire internal ceiling area.
  • iRide structural steel locally sourced and fabricated. The design incorporated the piled foundations and was installed through roof sections with various cranes to complete the installation process.
  • Sound proof roofing installed requiring 5 layers of materials to ensure outside noise deflection creating the best possible sound experience.
  • Shotcrete walls installed to a total height of 3.6m.