Search
Alder Constructions
  • Who We Are
  • Our People
  • Our Projects
  • Expertise
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Previous Previous Previous Next Next Next
1234
Open image in lightbox: Alder-StarCasino005a Open image in lightbox: Alder-StarCasino005a
Open image in lightbox: The Star Integrated Arrival 2 Open image in lightbox: The Star Integrated Arrival 2
Open image in lightbox: The Star Integrated Arrival 3 Open image in lightbox: The Star Integrated Arrival 3
Open image in lightbox: The Star Integrated Arrival 1 Open image in lightbox: The Star Integrated Arrival 1

The Star Integrated Arrival

At a Glance

Client

The Star Entertainment Group

Completed

April 2018

Location

Broadbeach QLD

Type of Service

Construct Only

Project Value

$3.3m

Project Details

Alder Constructions were engaged by The Star Entertainment Group to revitalise the aging Casino Drive and Porte Cochere. This involved a total replacement of the existing softscaping, footpath, asphalt, acoustic fencing and sandstone pavers.

Throughout the Project, a complex staging process was implemented to manage the high volume of traffic, client access and conflicting building works. As a result, the Project was successfully delivered without interruption to The Star’s business, patrons, staff or building construction works.

Scope of Works

  • Supply and install 3500m² softscaping
  • Supply and install 950m² of imported granite pavers
  • Demolish 1100m² concrete footpath and reinstating with new exposed concrete footpaths
  • Stage works to accommodate high volume of traffic and pedestrians
  • Temporary traffic control and pedestrian diversions
  • Demolish and replace 500m of fencing
  • Reinstate 300m electrical conduit in line with Australian Standards
  • Retrofit all street lights with new state of the art LED fittings
  • Rejuvenated exiting vehicle barrier and hand railing
  • Profile and asphalt 6000m² road surface
  • Constructed GlasGrid reinforced asphalt
  • Design, supply and install security bollards

Print Project

Download PDF

Previous Project

Aura Apartments

Next Project

C-17 Maintenance Facility

Who We Are

Our People

News

Careers

Expertise

Projects

Alder Developments

Current Tenders

Accreditations

Policies

Who We Are

Our People

News

Careers

Current Tenders

Accreditations

Policies

Alder Developments

Website by Ola Digital | Copyright Alder Constructions | Privacy
  • Link to LinkedIn
  • Link to Instagram
  • Link to Facebook
  • Link to Youtube
Link to: Aura Apartments Link to: Aura Apartments Aura Apartments Link to: C-17 Maintenance Facility Link to: C-17 Maintenance Facility C-17 Maintenance Facility
Scroll to top Scroll to top Scroll to top