Search
Alder Constructions
  • Who We Are
  • Our People
  • Our Projects
  • Expertise
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Previous Previous Previous Next Next Next
123456
Open image in lightbox: AuraApartments518 Open image in lightbox: AuraApartments518
Open image in lightbox: AlderAuraDisplay001 Open image in lightbox: AlderAuraDisplay001
Open image in lightbox: AlderAuraDisplay005 Open image in lightbox: AlderAuraDisplay005
Open image in lightbox: AuraApartments523 Open image in lightbox: AuraApartments523
Open image in lightbox: AlderAuraYellowRoof032 Open image in lightbox: AlderAuraYellowRoof032
Open image in lightbox: AlderAura063 Open image in lightbox: AlderAura063

Aura Apartments

At a Glance

Client

Varsity Developments

Completed

March 2018

Location

Varsity Lakes QLD

Type of Service

Design & Construct

Project Value

$29m

Project Details

This boutique multi-residential apartment development is perfectly located in Varsity Lakes with Lake Orr at its front door. Residents benefit from a suite of amenities including swimming pools, gym, sauna, spa, landscaped gardens and rooftop terraces with panoramic 360 degree views.

This quality development brings resort style living to a growing suburban area of the Gold Coast within close proximity of Bond University, Robina Town Centre and a myriad of cafes and restaurants. The project consisted of 4 multi-levelled residential towers, comprising of 120 apartments, all either 1, 2 or 3 bedrooms and all of high quality finishes.

All apartments have generous sized balconies incorporated into their designs, showcasing the features of the apartment buildings and the 360 degree views.

Scope of Works

  • Solar panels have been installed to the roof top area to Tower 4 to supply electricity to the development.
  • Large basement car park and plenty of storage spaces are provided for the unit owners.
  • Granite bench tops to all kitchens.
  • High quality finishes and generous size balconies.
  • Two resort style pools, gym, sauna, spa, roof top terraces and landscaped gardens.
  • Every apartment is beautifully appointed with stacked sliding doors which are fully retractable leading onto the balcony, timber-look flooring to the living areas and stone benchtops in the kitchen, complete with quality stainless steel appliances.
  • Works were completed in proximity to busy pedestrian pathways requiring community engagement and communication.

Print Project

Download PDF

Previous Project

Warwick Water Treatment Plant

Next Project

The Star Integrated Arrival

Who We Are

Our People

News

Careers

Expertise

Projects

Alder Developments

Current Tenders

Accreditations

Policies

Who We Are

Our People

News

Careers

Current Tenders

Accreditations

Policies

Alder Developments

Website by Ola Digital | Copyright Alder Constructions | Privacy
  • Link to LinkedIn
  • Link to Instagram
  • Link to Facebook
  • Link to Youtube
Link to: Warwick Water Treatment Plant Link to: Warwick Water Treatment Plant Warwick Water Treatment Plant Link to: The Star Integrated Arrival Link to: The Star Integrated Arrival The Star Integrated Arrival
Scroll to top Scroll to top Scroll to top