Search
Alder Constructions
  • Who We Are
  • Our People
  • Our Projects
  • Expertise
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Previous Previous Previous Next Next Next
1234
Open image in lightbox: Australian Industry Trade College 1 Open image in lightbox: Australian Industry Trade College 1
Open image in lightbox: Australian Industry Trade College 2 Open image in lightbox: Australian Industry Trade College 2
Open image in lightbox: Australian Industry Trade College 4 Open image in lightbox: Australian Industry Trade College 4
Open image in lightbox: Australian Industry Trade College 3 Open image in lightbox: Australian Industry Trade College 3

Australian Industry Trade College

At a Glance

Client

Australian Industry Trade College

Completed

January 2011

Location

Robina QLD

Type of Service

Design & Construct

Project Value

$5.2m

Project Details

Alder Constructions’ history with the Australian Industry Trade College is long-standing and rewarding commencing with the design and construction of their first campus in Robina. The college construction featured two main buildings – 500m² administration wing and 1,265m² classroom wing. During the construction of these 2 wings, an additional mezzanine staff office and amenities level was added to the classroom block.

The design incorporated extensive green elements such as solar panels complete with data loggers and energy meters, smart C-Bus system integrated to power and lighting systems and also mechanical services system to ensure efficient operation at all times, rainwater harvesting tanks and a bio-retention basin.

Upon completion of the new campus, Alder Constructions’ Managing Director, Greg Alder went on to hold a charitable position on the board for 6 years before fulfilling an additional 3 year tenure as Chairperson.

2011 Master Builders Regional Award Winner

Scope of Works

  • Collaborative design management and delivery with College and Consultants.
  • Extensive use of coloured and exposed aggregate concrete to external driveways and footpath areas.
  • A coffered plasterboard ceiling with specialist feature lighting within the custom designed and built Executive Board Room.
  • A miniature external sports floor including full size basketball backboard and ring.
  • A large chess board / checker boardmade out of 500 x 500 vitrified ceramic tiles.
  • A purpose built cool room and provision of essential services for a future training kitchen.
  • Stainless Steel signwriting over alucobond cladding.
  • Extensive use of feature lighting to external areas such as tilt-up panel and coloured blockwork walls, timber ply soffits, garden up lighters and pathways.
  • Use of hebel wall panel to the Administration Wing.
  • Works were completed ahead of schedule and commencement of the school year.

Print Project

Download PDF

Previous Project

Discovery Park Urban Water Design

Next Project

Soul Surfers Paradise Foreshore

Who We Are

Our People

News

Careers

Expertise

Projects

Alder Developments

Current Tenders

Accreditations

Policies

Who We Are

Our People

News

Careers

Current Tenders

Accreditations

Policies

Alder Developments

Website by Ola Digital | Copyright Alder Constructions | Privacy
  • Link to LinkedIn
  • Link to Instagram
  • Link to Facebook
  • Link to Youtube
Link to: Discovery Park Urban Water Design Link to: Discovery Park Urban Water Design Discovery Park Urban Water Design Link to: Soul Surfers Paradise Foreshore Link to: Soul Surfers Paradise Foreshore Soul Surfers Paradise Foreshore
Scroll to top Scroll to top Scroll to top