Search
Alder Constructions
  • Who We Are
  • Our People
  • Our Projects
  • Expertise
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Previous Previous Previous Next Next Next
123
Open image in lightbox: Warwick Water Treatment Clarifier 2 Open image in lightbox: Warwick Water Treatment Clarifier 2
Open image in lightbox: Warwick Water Treatment Clarifier 3 Open image in lightbox: Warwick Water Treatment Clarifier 3
Open image in lightbox: Warwick Water Treatment Clarifier 1 Open image in lightbox: Warwick Water Treatment Clarifier 1

Warwick Water Treatment Plant

At a Glance

Client

Southern Downs Regional Council

Completed

March 2018

Location

Warwick QLD

Type of Service

Construct Only

Project Value

$2.5m

Project Details

This project involved the construction of a 26m diameter, 3 megalitre cast in-situ reinforced concrete clarifier for the Southern Downs Regional Council in Warwick.

This vital piece of infrastructure forms part of Southern Downs Regional Council’s future growth plan and enables greater capacity for the treatment of raw water entering the plant from the surrounding dams.

Scope of Works

  • Demolition of existing structures and site preparation.
  • Construction of 50lm long x 2.5m high curved retaining wall for the lower section of the clarifier.
  • Bulk Earthworks to Level 1 Geotechnical Certification.
  • Construction of 140m3 clarifier base slab with dome shape for ‘desludging’ of the clarifier.
  • Construction of 75lm long x 6m high reinforced concrete walls including all waterproofing treatments at penetrations and construction joints.
  • Construction of reinforced concrete suspended slab and walls for “Launder Channel”.
  • Mechanical D&C of treatment components including structural bridge, inlet pipe, central column, weir plates, scraper arms and flocculation wells.
  • Detailed design, fabrication and installation of structural steel access staircase, perimeter walkway and miscellaneous components.
  • Procurement and installation of Stainless Steel and DICL pipework, fittings and valves up to 750dia in size to provide inlet, outlet, overflow and scour lines for the clarifier.
  • Detailed design, fabrication and installation of unique ‘3-way Y-piece’ from Stainless Steel to be installed during night time plant shut down.
  • Epoxy coating of Launder Channel to meet design requirements and provide 25-year product and application warranty.
  • Electrical works including power supply, plant lighting, Rotork actuated valves, level sensors, level floats and flowmeters installed.
  • Assist with the overall programming, ‘one-touch operation’ and integration of the new clarifier with existing plant.

Print Project

Download PDF

Previous Project

Coomera Anglican College Primary Learning Resource Centre

Next Project

Aura Apartments

Who We Are

Our People

News

Careers

Expertise

Projects

Alder Developments

Current Tenders

Accreditations

Policies

Who We Are

Our People

News

Careers

Current Tenders

Accreditations

Policies

Alder Developments

Website by Ola Digital | Copyright Alder Constructions | Privacy
  • Link to LinkedIn
  • Link to Instagram
  • Link to Facebook
  • Link to Youtube
Link to: Coomera Anglican College Primary Learning Resource Centre Link to: Coomera Anglican College Primary Learning Resource Centre Coomera Anglican College Primary Learning Resource Centre Link to: Aura Apartments Link to: Aura Apartments Aura Apartments
Scroll to top Scroll to top Scroll to top