Search
Alder Constructions
  • Who We Are
  • Our People
  • Our Projects
  • Expertise
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Previous Previous Previous Next Next Next
12345
Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 5 Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 5
Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 1 Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 1
Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 2 Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 2
Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 3 Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 3
Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 4 Open image in lightbox: Gold Coast Centre for Bone & Joint Surgery 4

Gold Coast Centre for Bone & Joint Surgery

At a Glance

Client

THE ORTHOPAEDIC PRACTICE PTY LTD

Completed

December 2018

Location

Palm Beach QLD

Type of Service

Design & Construct

Project Value

$2.4m

Project Details

This specialist centre was a complete design and construct project and has become the new home for one of the Gold Coast’s most prominent Bone and Joint Specialists – The Orthopaedic Practice Pty Ltd.

The facility is designed to accommodate new patient consultation and post-operation care, treatment, observation and rehabilitation. The building consists of a full-sized basement carpark with ground floor office and consultancy including patient waiting areas, doctor and professional health services suites, treatment rooms and amenities.

Scope of Works

  • The full-sized basement carpark was constructed in dunal sands which required a mixture of sheet piling and contiguous piling. The final solution ensured neighbouring buildings were not damaged.
  • Due to the extremely tight boundary constraints, planning and staging of the works was required to ensure maximum efficiency and productivity during the build and minimal disruption to neighbouring properties and street users.
  • Installation of a 30kW solar system bank that runs the building free of mains power during standard facility operating hours.
  • Basement and retaining structures.
  • Ground Floor structures and roofing.
  • Internal fit-out and finishes.
  • External feature cladding and rendering.
  • External civil carparking and landscaping works.

Print Project

Download PDF

Previous Project

C-17 Maintenance Facility

Next Project

Sky Voyager iRide

Who We Are

Our People

News

Careers

Expertise

Projects

Alder Developments

Current Tenders

Accreditations

Policies

Who We Are

Our People

News

Careers

Current Tenders

Accreditations

Policies

Alder Developments

Website by Ola Digital | Copyright Alder Constructions | Privacy
  • Link to LinkedIn
  • Link to Instagram
  • Link to Facebook
  • Link to Youtube
Link to: C-17 Maintenance Facility Link to: C-17 Maintenance Facility C-17 Maintenance Facility Link to: Sky Voyager iRide Link to: Sky Voyager iRide Sky Voyager iRide
Scroll to top Scroll to top Scroll to top